Access Bridge, Don Mueang Terminal
Project Name Access Bridge, Don Mueang Terminal Project Specification Build-up I-girder steel curve beam (Elevated Bridge) SG 1 > 27.4 m SG 2 > 25.2
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/06/121166667_112042144010469_3389158926195860204_n.jpg?fit=300%2C169&ssl=1)
PTTLNG NONG FAB LNG Terminal
Project Name PTTLNG NONG FAB LNG Terminal Project Specification SCC Concrete is applied 8.00 m span double T-girder For vertical L.L 500 & 1500 kg
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/06/78715.jpg?fit=300%2C180&ssl=1)
Kronos Office Tower
Project Name Kronos Office Tower Project Specification Decorated PC Wall Plain PC Wall Column strip PC Wall GRC for Podium Contract Amount 20 million THB
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/06/176043071_3670819066477407_8117812738160758640_n-1.jpg?fit=300%2C200&ssl=1)
TERRA Data Center
Project Name TERRA Data Center Project Specification 9,000 sq-m pc wall coverage PC drainage outlet PC stairs (fast speed) Contract Amount 25 million THB Project
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/06/Picture6.jpg?fit=300%2C234&ssl=1)
Bo Ba Htoo Housing Project
Project Name Bo Ba Htoo Housing Project Project Specification 8-storey building totally of 13 nos. The area of the project covers about 21,000 sq-m Load
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/06/Picture1.jpg?fit=300%2C154&ssl=1)
Bo Ba Htoo Bridge
Project Name Bo Ba Htoo Bridge Project Specification Post-tensioned Cross Beam Bore Pile Foundation I-Girders Plank Girders Contract Amount 6.50 mil USD (Estimated) Time Period
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/06/002.jpg?fit=300%2C174&ssl=1)
Nga Moe Yeik Bridge (River Crossing)
Project Name Nga Moe Yeik Bridge (River Crossing) Project Specification River crossing bridge Using prstressed girders Total length 300 m. 2 traffic land Maximum span
![](https://i0.wp.com/www.tpcconcrete.com/wp-content/uploads/2021/05/003-21.jpg?fit=300%2C186&ssl=1)
Overpass Bridge
Project Name Overpass Bridge Project Specification Prestressed girders Beam span ranging from 25-30 m. Some overpass is available with escalator installed. Contract Amount 0.75 mil